Proven Performance: Australian Case Studies
Explore real-world examples from our Australian operations, showcasing the significant savings in fuel, emissions, and operational costs our hybrid power technology delivers. This is the proven performance we are bringing to New Zealand.
YHI-1 Containerised Power System (Australian Example)
Performance metrics and cost savings from our flagship containerised solar generator, deployed at a Queensland construction site. This case study exemplifies the capabilities being introduced to NZ.
Case Study: YHI-1 Containerised System Deployment
38% less cost
Same amount of power, but much lower operating costs than renting a conventional diesel generator. This translates to significant savings over the project duration.
98% less generator run hours
4582 less hours of generator operation, thanks to the integrated solar array, charger, battery and inverter systems. This dramatically reduces maintenance requirements and extends generator life.
98% less fuel
Only used during inclement weather, lower generator run time yields lower fuel / refueling costs. This significantly reduces operational expenses and maintenance requirements.
30.21 tons CO2 reduction
A direct benefit of lower engine run times and fuel consumption. This significant carbon footprint reduction helps meet sustainability goals and environmental requirements.
Noise abatement
A reduced noise footprint with only less than 40dB (quiet office or refrigerator). This makes it ideal for noise-sensitive environments and improves working conditions.
100% uptime
Remotely monitored by SOBOS with client cloud app login, ensuring reliability is achieved. Continuous monitoring prevents downtime and enables proactive maintenance.
WALA Skid-Based Power System (Australian Example)
Proven reliability and significant savings from our transportable skid system, deployed at a Queensland construction site. This demonstrates the technology planned for our NZ fleet.
Case Study: Shadforth Construction Site, Queensland
46% less cost
Same amount of power, but much lower operating costs than a conventional diesel generator. This translates to significant savings over the project duration.
99% less generator run hours
8863 less hours of generator operation, thanks to integrated solar array, charger, battery and inverter systems. This reduces maintenance requirements and extends generator life.
99% less fuel
Generator ran primarily for scheduled maintenance checks, significantly cutting fuel use and required oil changes. This minimized refueling logistics and simplified overall site operations.
58.5t less CO2 emissions
Reduced fuel use also cuts NOx, CO, PM & hydrocarbons. This results in cleaner air quality on site and a significantly smaller environmental footprint.
Noise abatement
A reduced noise footprint with only <40dB (quiet office or refrigerator). This makes it ideal for noise-sensitive environments and improves working conditions.
100% uptime
Remotely monitored by SOBOS and with client cloud app login, ensuring reliability is achieved. Continuous monitoring prevents downtime and enables proactive maintenance.
Plan Your NZ Power Solution
Our upcoming NZ-built hybrid generator systems will offer superior efficiency and sustainability. Contact us to discuss your future off-grid power needs in New Zealand.
Discuss Your NZ Project with Our Team
We're ready to discuss your upcoming New Zealand project requirements and provide tailored power solutions based on our proven technology.
Phone
027 328 0415
info@sobos.co.nz